Skip to main content

Featured Case Study | Education & Campus Facilities

Campus-Wide Reality Capture & As-Built BIM Development

Client: AB Tech Community College | Lead Consultant: LS3P | Reality Capture: QRC

16 BUILDINGS

Campus Portfolio Captured

600,000 SQ FT

Total Spatial Area

30–45 DAYS

Turnkey Execution Window

LOD 200

Autodesk Revit BIM Standard

The Challenge & Objective

Comprehensive existing-conditions documentation across 16 campus buildings in Asheville, NC. The goal was to establish a scalable digital baseline for long-term facility management, lifecycle planning, and upcoming capital improvement projects.

Methodology & Execution

Terrestrial LiDAR workflows capturing survey-grade interior and exterior data across complex architectural geometries and plenum/MEP interfaces with zero disruption to daily institutional operations.

Strategic Value Delivered

Risk Mitigation

Eliminates field-verification errors during renovation design phases.

Operational Efficiency

Provides a turnkey framework for Facility Management (FM) integration.

Future Scalability

Creates a digital twin foundation ready for LOD 300+ modeling and smart campus IoT integration.

Package Deliverables

  • Centralized LOD 200 Revit Model
  • 2D Site Plans & Floor Plans
  • Reflected Ceiling Plans (RCPs)
  • Exterior Elevations & Roof Plans
  • High-Density Registered Point Clouds
Request a Similar Campus Assessment

Ready to Capture Your Campus?

Tell us about your institutional project and we'll deliver a detailed proposal within 3 business days.

Get a Quote
Request a Quote